A traffic management plan starts with the risks
A traffic management plan, or TMP, explains how the traffic risks created by a project will be managed. It considers workers, drivers, cyclists, pedestrians and access to neighbouring properties. For Queensland construction projects, the plan should describe the work stages, the road environment, who is responsible and how the arrangement will be checked. ETG helps clients organise practical traffic management planning for civil works, utilities, building sites and events. The starting point is a clear scope of work, not a diagram copied from an unrelated project.
TMPs and TGS drawings are different
A traffic guidance scheme is the drawing used to communicate the temporary signs, devices and movements for a particular arrangement. A TMP is the broader management document and may reference several schemes for different stages. A project with a changing work front might need separate layouts for establishment, construction, deliveries and reinstatement. We discuss which documents your road authority or principal contractor expects, including version control and the nominated implementation responsibilities. Design work and on-site implementation require appropriate qualifications and authority; a drawing alone does not authorise a closure.
Council and TMR submission support
First identify whether the road is council-controlled or state-controlled. Sunshine Coast Council, Noosa Council and TMR use different approval processes, and an adjoining road can have a different owner from the road outside your site. Your submission may need work details, drawings, proposed dates, stakeholder information and evidence of relevant permissions. ETG can help assemble the traffic documentation and clarify the planning scope. Approval times, fees and conditions are set by the authority. We do not promise an approval date, and you should allow time for assessment and revisions before committing plant and crews.

AI-generated illustration of a Queensland traffic management arrangement; not an ETG project record.
A coordinated process from enquiry to handover
Start by sending the location, scope and proposed dates. We review the traffic requirements with you and identify what further information is needed to prepare a meaningful quote. Where planning, permits, equipment and personnel are separate parts of the job, these should be confirmed individually so nothing is assumed to be included. The road authority sets approval conditions; the principal contractor remains responsible for its construction activities. Agree the work stages and the contact person for each responsibility before the site is established. During implementation, the crew should check the actual conditions against the current documentation and communicate any differences. Weather, traffic demand and plant movements may require a review. At the end of the activity, the handover should cover safe reopening and any controls that remain in place.
Queensland standards and site safety
Temporary traffic arrangements must be considered against the Queensland MUTCD Part 3, the Queensland Guide to Temporary Traffic Management and applicable TMR or council requirements. The qualifications needed depend on the role being performed: controlling traffic, implementing a scheme and designing a scheme are not interchangeable tasks. Pre-start briefings, equipment inspections, communication checks and a clear escalation process help keep the documented arrangement effective. ETG draws on the civil construction background of Exceed Concrete Construction, established on the Sunshine Coast in 1997. That connection helps us understand how concrete deliveries, excavation, changing work fronts and construction access affect traffic operations. Group quality, environmental and safety systems support a coordinated approach; project-specific documentation and current credentials should still be requested for your procurement review.
Coverage and a job-specific quote
Our head office is in Cooroy, with traffic management enquiries welcomed for Sunshine Coast, Noosa, Maroochydore, Caloundra, Gympie, Brisbane, Moreton Bay and Gold Coast works. Crew availability, travel, shift length, site complexity and equipment requirements affect the quote. Share any existing TMP, TGS or permit documents, including the current revision and approval conditions. If dates are not yet fixed, explain the likely program and decision points rather than selecting an arbitrary start date. For urgent or after-hours requirements, call 07 5449 8813 so the location and immediate risks can be discussed. A quote request does not confirm a booking or authority approval. ETG will clarify the proposed scope and next steps with you.
Current standards and permit information:
